Skip to content

Home

Lower Kootenay Band leads Canada’s largest Indigenous-led wetland restoration

Lower Kootenay Band leads Canada’s largest Indigenous-led wetland restoration

Yaqan Nukiy Wetland Project reconnects land, water, and culture in 517-hectare revival
Elk Valley Resources cuts jobs in response to global economic challenges

Elk Valley Resources cuts jobs in response to global economic challenges

Elk Valley Resources is reducing 140 staff positions at local mines, in response to challenging market conditions
Air rifle seized at Trail high school, no charges expected: RCMP

Air rifle seized at Trail high school, no charges expected: RCMP

The Trail RCMP provided a media update Friday morning after police responded to a report of a gun inside a car at the Trail high school the previous day.
Big White's infrastructure, operations boosted by $9.4M investment

Big White's infrastructure, operations boosted by $9.4M investment

'All of these enhancements play a role in our long-term vision for modernization'
Interior Health to close downtown Trail medical lab this summer

Interior Health to close downtown Trail medical lab this summer

Blood tests and specimen collection will continue at the LifeLabs Patient Services Centre on the second floor of Waneta Plaza
Wildfire on Kootenay Lake's East Shore under control

Wildfire on Kootenay Lake's East Shore under control

Drivers advised to use caution on Hwy 3A between Birch and Larch roads
Join an 'Evening to Remember' and bring heart to Columbia Gardens winery

Join an 'Evening to Remember' and bring heart to Columbia Gardens winery

The evening will blend fine wine, local flavour, and meaningful support for dementia awareness
‘We need a reset’: Kelowna MLA demands Interior Health CEO step down

‘We need a reset’: Kelowna MLA demands Interior Health CEO step down

Susan Brown is set to retire as CEO in December
West Kootenay-Boundary rallies for ALS walk Saturday in Trail

West Kootenay-Boundary rallies for ALS walk Saturday in Trail

Registration runs from 9:30 a.m. to noon at Gyro Park in Trail
Demolition prep underway for $15M rebuild of seniors villa in Trail

Demolition prep underway for $15M rebuild of seniors villa in Trail

Design has changed from original concept: the new building will be a single three-storey structure of 41 units