Construction is underway in Alberta on the twinning of the Trans Mountain pipeline to the B.C. coast. (Trans Mountain)

Landowner hearings begin for Trans Mountain expansion in Alberta

Detailed route talks start in Spruce Grove, in B.C. communities soon

The Canada Energy Regulator has begun its detailed route hearings on the Trans Mountain pipeline expansion project, starting with Alberta locations that are in dispute by property owners and moving to B.C. in the weeks to come.

The first two hearings were held Tuesday in Spruce Grove, with the first B.C. hearing in Kamloops in March and more to come along the expansion route through Merritt and into the Lower Mainland in the months ahead as more hearing orders are issued, a spokesperson for Canada Energy Regulator told Black Press.

“Detailed route hearings are required where an objection to the detailed route exists, and allow the commission to decide on whether the exact location of the pipeline is the best possible, and to confirm the most appropriate methods and timing of construction,” the regulator said in a statement released Tuesday.

RELATED: Industry cheers rejection of B.C.’s Trans Mountain suit

RELATED: Pipeline contractors hiring in tight skilled labour market

“Landowners whose lands are proposed to be crossed by the pipeline, as well as Indigenous groups and other persons whose land may be adversely affected were able to object to the detailed route proposed by Trans Mountain. The commission granted detailed route hearings where material changes in circumstances were identified since 2018, or where hearings had been granted but not completed prior to the court decision stopping the project in 2018.”

The twinning project runs for 1,147 km on a pipeline approximately 150 metres wide. It was re-approved by the federal government in June 2019, after additional consultation required by the Federal Court of Appeal.

Construction is underway along the Alberta portions, as well as the Edmonton and Burnaby terminals and the Westridge Marine Terminal. Trans Mountain Pipeline ULC, the company formed by the Justin Trudeau government to own and operate the 1954 pipeline and its expansion project, submitted its latest construction schedule to the regulator on Jan. 2.

From the Greater Edmonton section, the Trans Mountain right of way goes to Edson, Hinton, Spruce Grove, Stony Plain and Wabamun before reaching the Jasper-Mount Robson stretch where twinning was completed a decade ago. Entering B.C. in the North Thompson region, the pipeline route goes by Avola, Barriere, Blue River, Clearwater, Valemount and Vavenby, a region where the forest industry has been wound down due to market conditions and loss of lumber to beetle infestations and fires.

From there the Trans Mountain line goes past Kamloops and Merritt, then down the Coquihalla Pass to Hope, Chilliwack, Abbotsford, Langley, Surrey, Coquitlam and Burnaby.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislatureTransMountain

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Golden Bear Children’s Centre in Rossland secures five-year lease

The centre’s monthly lease will rise to $1000 by 2023

Trial of RCMP officer begins in Nelson’s Capitol Theatre

Jason Tait is charged with manslaughter after an incident in 2015

Nine new COVID-19 cases announced in Interior Health region

The total number of cases since the pandemic started is now at 531 for the region

Kaslo councillor admits to ‘baiting’ member of public in email exchange

Kaslo Village Council to consider adopting code of conduct

Unofficial holidays: Here’s what people are celebrating for the week of Sept. 27 to Oct. 3

World Farm Animals Day, Drink Beer Day and Virus Appreciation Day are all coming up this week

B.C.’s top doctor encourages Halloween costumes to include masks

Dr. Bonnie Henry will soon be releasing guidelines on how to safely trick-or-treat this Halloween

Horgan frustrated as Transport Canada mandate for BC Ferry riders returns

Transport Canada reinstates rule that bans passengers from lower decks

Reincarnation, baby! Music-making B.C. couple celebrate ‘miracle’ pregnancy

‘I (said) to Adam, ‘I really think this is your brother reincarnated,’ Elise Estrada says

Survey finds doctors worry supplies of flu vaccine, PPE will lag demand

Canadian health officials have said additional flu vaccines have been ordered to meet expected demand

Search suspended for Indigenous elder last seen mushroom picking in northwest B.C.

Mushroom picker Thomas (Tommy) Dennis has been missing since Sept. 16

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

Ahead of likely second wave, 60% of Canadians relaxing COVID-19 measures

Proportion of Canadians following safety measures has dropped by 3 per cent in the past two weeks

Canada’s population tops 38 million, even as COVID-19 pandemic slows growth

Immigration, the top population driver, decreased due to the pandemic

Lightning strike: Tampa Bay blanks Dallas 2-0 to win Stanley Cup

Hedman wins Conn Smythe Trophy as playoff MVP

Most Read